Our experienced crews rehab tracks using tie gangs with tie change-out equipment. Paul jarvie also does crossing rehabilitation and joint maintenance.
- Track removal and reconstruction
- Rail change out gangs to replace or transpose rail, installation of ribbon or bolted rail, and replacement or tightening of bolts at track joints
- Tie gangs with production tie change out equipment
- Reconditioning or replacement of turnouts, switch points, and frogs
- Crossing rehabilitation
- Welding and profile grinding of railheads to build up mismatched rail ends
- Track geometry, load and ultra-sonic rail testing