Our experienced crews rehab tracks using tie gangs with tie change-out equipment. Paul jarvie also does crossing rehabilitation and joint maintenance.

  • Track removal and reconstruction
  • Rail change out gangs to replace or transpose rail, installation of ribbon or bolted rail, and replacement or tightening of bolts at track joints
  • Tie gangs with production tie change out equipment
  • Reconditioning or replacement of turnouts, switch points, and frogs
  • Crossing rehabilitation
  • Welding and profile grinding of railheads to build up mismatched rail ends
  • Track geometry, load and ultra-sonic rail testing